星期五, 10 1 月, 2025
Home PV News Wind turbine towers to be built in Ontario for Vestas

Wind turbine towers to be built in Ontario for Vestas

Towers for wind turbines destined for Vestas's Ontario wind projects will be manufactured by CS Wind in Ontario .


Essar Steel Algoma in Sault Ste. Marie, Ontario, will provide the steel. The CS Wind facility will roll, form, shape and weld together steel sheets for the towers. The factory  is expected to deliver its first tower to Vestas in November 2011.


Renewable energy equipment providers such as Vestas face local-content requirements in Ontario. Vestas had its first wind turbine installed in Ontario in 2001. Vestas has 232 turbines in operation in the province for a total of 390 MW.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Riyadh Declaration Solar Empowers Land and People Action Plan

December 9, 2024 Riyadh, Saudi Arabia On December 9, 2024, the 16th Conference of the Parties (COP16) of the United Nations Convention to Combat Desertification (UNCCD)...

Liu Zhuo, Sales Manager of TBEA, delivered a speech titled “Green Energy Makes Life Better” at COP16

On the afternoon of December 9, Liu Zhuo, Sales Manager for the Middle East Region at TBEA, delivered a speech titled "Green Energy Makes...

Side Event Themed “Solar empowers land and People from scarcity to prosperity:Integrated Solutions for water, food and ecosystems” took place at COP16

The side event of the 16th Conference of the Parties to the United Nations Convention to Combat Desertification (UNCCD) (COP16) "Solar empowers land and People from...

COP16 China Pavilion Side Event Series Report: Wang Weiying of China Renewable Energy Engineering Institute Proposed Coordinated Development of Renewable Energy and Ecology in...

The China Pavilion held a side event with the theme of "Planning and Ecological Design of Solar PV Power Stations in Desert Areas" on the...