星期日, 9 3 月, 2025
Home PV News Tepco Reports Second Deadly Radiation Reading at Fukushima Plant

Tepco Reports Second Deadly Radiation Reading at Fukushima Plant

Tokyo Electric Power Co. reported its second deadly radiation reading in as many days at its wrecked Fukushima nuclear plant north of Tokyo.


The utility known as Tepco said yesterday it detected 5 sieverts of radiation per hour in the No. 1 reactor building. On Aug. 1 in another area it recorded radiation of 10 sieverts per hour, enough to kill a person "within a few weeks" after a single exposure, according to the World Nuclear Association.


Radiation has impeded attempts to replace cooling systems to bring three melted reactors and four damaged spent fuel ponds under control after a tsunami on March 11 crippled the plant. The latest reading was taken on the second floor of the No. 1 reactor building and will stop workers entering the area.


"This does emphasize what care has to be taken," Richard Wakeford, a visiting professor of epidemiology at the University of Manchester's Dalton Nuclear Institute in England, said in a telephone interview. "They have to put robots into those areas where they might expect high radiation levels. It's no real substitute for human access."


The 10 sieverts of radiation detected on Aug. 1 outside reactor buildings was the highest the Geiger counters used were capable of reading, indicating the level could have been higher, Junichi Matsumoto, a general manager at the utility, said at a press conference.


"In the area surrounding the breach of containment you'd expect high levels of contamination and those high levels would be difficult to predict," Wakeford said. "You can dig them up if they're on the soil and contain it or wash it down if it's on the side of a building."


Tepco Criticism


Tepco was forced to pump water into the three reactors after the March 11 earthquake and tsunami disabled cooling systems. The company in May estimated there would be 200,000 tons of radiated water in basements and other areas of the Fukushima Dai-Ichi plant by December.


"If nuclear fuels melted through containment chambers, Tepco will find even higher radiation readings after water in building basements is removed," said Tetsuo Ito, the head of the Atomic Energy Research Institute at Kinki University.


Tepco has been criticized by the government for withholding radiation data and other missteps that have compounded the crisis, which led to 160,000 people being evacuated from near the plant.


Radiation leaks from the Fukushima reactors have spread over 600 square kilometers, Tomio Kawata, a fellow at the Nuclear Waste Management Organization of Japan, said in a research report published on May 24 and given to the government.


Pockets of Soil


Radioactive soil in pockets of areas outside the exclusion zone around the plant have reached the same level as in Chernobyl following a reactor explosion in the former Soviet Union territory 25 years ago, the report said.


The threats to Japan's food chain are also multiplying as radioactive cesium emissions from the Fukushima plant spread. Contaminated beef has been found on supermarket shelves around the country, forcing the government to ban cattle shipments from areas in northern Japan.


The latest high radiation readings are probably coming from materials released during early failed attempts to release pressure in containment vessels and vent hydrogen gas to prevent explosions that damaged reactor buildings, Matsumoto said. There were about 2,760 workers at the plant on Aug 1.


Tepco on April 17 set out a so-called road map to end the crisis by January, aiming to bring down radiation levels at the plant within three months and then achieve a so-called cold shutdown where reactor temperatures fall below 100 degrees Celsius (212 degrees Fahrenheit).


 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Sungrow Hosts “Tailored Solutions, Full Coverage” Distribution Summit in Thailand, Introducing Tailored Energy Solutions

Sungrow, a global leading PV inverter and energy storage system provider, successfully hosted its regional distribution summit under the theme "Tailored Solutions, Full Coverage" in Thailand on 28th February....

Romania subsidizes municipal authorities with 86% for solar power investments

The Ministry of Energy provided EUR 28.8 million for 105 photovoltaic projects of 23.1 MW in total in almost all counties of Romania. The...

Sungrow supplies inverters, battery system for hybrid solar park in Sweden

One of Sweden’s first hybrid solar parks has been deployed in Halmstad. Sungrow, which provided the inverters and battery system, said it is a...

Pertamina NRE to build solar panel assembly plant in W. Java, to be operable by 2026

Pertamina New and Renewable Energy (Pertamina NRE), a renewable energy subholding of State energy company PT Pertamina, is currently constructing a solar panel assembly...