星期六, 23 11 月, 2024
Home PV News Europe Cambridge University solar farm to boost net zero target

Cambridge University solar farm to boost net zero target

Source:BBC NEW

Cambridge University plans to build its own solar farm in a bid to meet its net zero target.

The new solar farm, on farmland off Barton Road, in Barton, Cambridgeshire, will be used to supply electricity to the university.

The farm would free up the equivalent power for domestic use of 7,500 homes, the university said.

Before any instillation can take place the application will need to be referred to the secretary of state.

A representative of the university told a South Cambridgeshire District Council planning meeting climate change was one of the “most pressing problems”.

They said the university felt “responsible to take a leading role in decarbonising the global economy”.

If it goes ahead, the solar farm is expected to offer 30,457 megawatt hours per annum, which the university said would meet 26% of its energy needs.

The solar farm is planned to be in place for 40 years, after which the university said the land would be returned to agricultural use.

The representative said this particular site had been chosen after considering the different bits of land owned by the university.

This site was found to have lower quality farmland and it was possible to put in a connection to send the generated electricity to the university.

An underground cable is planned to be installed.

Planning officers at the district council recommended the application be approved.

In a report, they said while it was considered “inappropriate development in the green belt”, there were benefits including the renewable energy and biodiversity net gain.

Conservative councillor Mark Howell said the plans for the new solar farm was an “industrialisation of the green belt”.

However, Liberal Democrat councillor Dr Tumi Hawkins said she believes the “balance of this provision outweighs the harm to the green belt in my view”.

A majority of councillors approved the plans.

It would need to be referred to the secretary of state for energy before any installation work can take place.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

China CORNEX signed cooperation agreement with the Italian Cestari Group

On November 13, CORNEX signed a strategic cooperation agreement with the Italian company Cestari Group in Wuhan, Hubei Province, China. According to the agreement,...

Solar Leader Enphase Energy Cutting 500 Jobs

California-based Enphase Energy, a company known for its solar power and electric vehicle (EV) charging technology, announced it is laying off about 500 workers....

Cincinnati’s solar array powers city operations, tens of thousands of homes

A sprawling solar array in Highland County now powers 20% of Cincinnati's operations and tens of thousands of homes. Cincinnati’s 900-acre solar farm was completed...

1.2-GW solar panel assembly facility to open in Puerto Rico

A contract solar panel assembly facility will soon open in Aguadilla, Puerto Rico, that will supply the utility-scale market on the island and hopefully...