星期六, 23 11 月, 2024
Home PV Technology ACCIONA installs AW-3000/116, 3 MW wind turbines in North America

ACCIONA installs AW-3000/116, 3 MW wind turbines in North America

ACCIONA Windpower is installing two of its AW-3000/116, 3 MW wind turbines at Pioneer Grove in Cedar County, Iowa, USA, marking the first installation of the turbines in North America.

"The AW-3000 turbines at Pioneer Grove will produce more power, more efficiently than anything we've installed before," says Joe Baker, CEO of ACCIONA Windpower North America.

"With technology like the AW-3000, we can drive down energy costs and begin to take full advantage of our clean energy resources."

The Pioneer Grove Wind Farm is located nearest to the town of Mechanicsville, Iowa. Construction is expected to be complete in the second half of 2012, and the wind farm already has a long-term power purchase agreement (PPA) with Central Iowa Power Cooperative (CIPCO).

The enhanced AW-3000 machine with a 116 m rotor diameter was introduced in 2011, and is designed for sites with medium wind speeds.

Two towers
The Pioneer Grove Wind Farm will utilise two different wind turbine tower technologies with the AW-3000. One tower will be constructed to a height of 92 m, using steel, while the other tower uses a new concrete solution and measures 100 m.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

China CORNEX signed cooperation agreement with the Italian Cestari Group

On November 13, CORNEX signed a strategic cooperation agreement with the Italian company Cestari Group in Wuhan, Hubei Province, China. According to the agreement,...

Solar Leader Enphase Energy Cutting 500 Jobs

California-based Enphase Energy, a company known for its solar power and electric vehicle (EV) charging technology, announced it is laying off about 500 workers....

Cincinnati’s solar array powers city operations, tens of thousands of homes

A sprawling solar array in Highland County now powers 20% of Cincinnati's operations and tens of thousands of homes. Cincinnati’s 900-acre solar farm was completed...

1.2-GW solar panel assembly facility to open in Puerto Rico

A contract solar panel assembly facility will soon open in Aguadilla, Puerto Rico, that will supply the utility-scale market on the island and hopefully...